I know I’m going to start sounding like a broken record (if I haven’t already), but what gives? The total cost for developing and fielding Delta IV Medium was about $2B. That included taking a new, high-thrust, LOX/LH2 engine from a clean-sheet design to operational status. That included developing the CBC stage. That included building a new factory in Decatur meant to crank out 2-3 dozen of these per year. That included new pads. All this for a completely clean-sheet design. Atlas V only cost $1B (since they didn’t have to develop a new engine). So for the EELV program we’re talking about $3B, and if I’m remembering it right, only about $1-1.5B of that came from the government.

With this in mind, why the heck is the Shaft so freakin expensive?!? We’re talking somewhere between $2.5-5B dollars, in spite of the fact that they claim to not be doing hardly anything new. They claim they’re using a slightly upgraded version of a booster that’s been flying for my whole life. They’re using an upper stage engine that is only a slight modification on an old design. They’re supposedly reusing shuttle tooling for the upper stage tanks. They’re going to refurbish existing pads. They’re not making a new factory. Why then is it so expensive? Why does this warmed over piece of Shuttle leftovers cost more than the EELV and COTS program combined?

Even if you count all the private money that’s been and will be going into Falcons I, V, and IX (currently at $100M, with my guess being that they’ll end up in the $200-250M range by the time they’re all flying), and RpK’s K-1 (currently at $800M, and likely to take another $400-500M to field) and add that to the Atlas V and Delta IV investments ($1 and $2B respectively), you still have less money ($4.5B) than the development costs for the Shaft. And that’s for two semi reusable vehicles, and two expendable ones. All clean-sheet designs.

Seriously? What the heck is going on here?

The following two tabs change content below.
Jonathan Goff

Jonathan Goff

Director of Advanced Concepts at Gravitics, Inc.
Jonathan Goff is a space technologist, inventor, and serial space entrepreneur who created the Selenian Boondocks blog. Jon was a co-founder of Masten Space Systems, and the founder and CEO of Altius Space Machines, a space robotics startup that he sold to Voyager Space in 2019. Jonathan is currently the Director of Advanced Concepts for the space station startup Gravitics. His family includes his wife, Tiffany, and five boys: Jarom (deceased), Jonathan, James, Peter, and Andrew. Jon has a BS in Manufacturing Engineering (1999) and an MS in Mechanical Engineering (2007) from Brigham Young University, and served an LDS proselytizing mission in Olongapo, Philippines from 2000-2002.
Jonathan Goff

About Jonathan Goff

Jonathan Goff is a space technologist, inventor, and serial space entrepreneur who created the Selenian Boondocks blog. Jon was a co-founder of Masten Space Systems, and the founder and CEO of Altius Space Machines, a space robotics startup that he sold to Voyager Space in 2019. Jonathan is currently the Director of Advanced Concepts for the space station startup Gravitics. His family includes his wife, Tiffany, and five boys: Jarom (deceased), Jonathan, James, Peter, and Andrew. Jon has a BS in Manufacturing Engineering (1999) and an MS in Mechanical Engineering (2007) from Brigham Young University, and served an LDS proselytizing mission in Olongapo, Philippines from 2000-2002.
This entry was posted in Uncategorized. Bookmark the permalink.

5 Responses to Relative Development Costs

  1. Monte Davis says:

    Excellent post!

  2. Josh Gigantino says:

    What is going on is the shoe-horning effect that also compromised Shuttle, an example of using the wrong tool for the task. EELVs and NewSpace vehicles are up to the task, the Stick/Shaft/Satay is proving expensive and inefficient.

    Excellent post Jon!

    – Josh Gigantino

  3. Andrew Case says:

    If I may indulge in a moment of gross cynicism, perhaps the cost is best explained by the fact that the Stick is being designed and built by people who have decades of hands-on experience at milking government contracts without delivering much of anything. EELV is being done by folks who are less skilled in the art of pork, and less willing to accept complete and total failure as a non-issue compared to the prime directive of making money and preserving privilege and power.

  4. Big D says:

    Man-rating.

    *runs*

  5. Kelly Starks says:

    Guess its late to be comments, but I think your missing the extra requiremnent for “The Stick” to maintain as much of the shuttle program staffs, on top of adapting the SRB systems which aren’t realy well adapted to this new mission. The other programs were “clean sheet”, hence not needing to retain legacy program overhead and personel. Also since a lot of the dev costs for the EELV’s were out of pocket, they did not need to allocate “fractions” of it to special interest groups as demanded by congress for gov furnished money. Since these political costs tend to be a few times the actually program costs for vehicle programs (3 times as much usually for NASA programs) that could easily explain why the EELV’s are so much cheeper then the “shuttle derived” stick.